Articles
22 6 月, 2026
Step-by-step instructions for replacing a bayonet fuse in a padmount transformer. Includes tools, safety procedures, and installation steps.
1 6 月, 2026
Transformer rewinding replaces damaged coils while keeping the original steel components. Save money, maintain your footprint, and cut lead times in half with Maddox.
20 5 月, 2026
When standard fusing reaches its capacity limits, you need a different way to protect your transformer. Learn how integrated vacuum interrupters compare to standalone switchgear for high-kVA applications.
11 5 月, 2026
Does your project need a liquid-filled or a dry-type transformer? Review the basics, locations, and common uses of both.
5 5 月, 2026
Maddox Industrial Transformer unveils its new Batavia Main Street Campus, a renovated fire station and three-building office hub revitalizing downtown.
4 5 月, 2026
Maddox is expanding its footprint in Battle Ground, Washington with a new office, warehouse, and storage yard.
27 4 月, 2026
Highland Electric needed a BABA-compliant padmount to power KWRL Transportation’s fleet of electric schoolbuses. But the industry lead time was forty-two weeks.
16 3 月, 2026
Learn how to install a low voltage dry-type transformer with this general guide covering wiring, primary tap settings, grounding, anchoring, and NEC compliance.
16 3 月, 2026
When EC Electric had project deadlines threatened by delayed transformers, they turned to Maddox. Read what happened next.